The Talcher Coal Gasification Project in India utilizes our company’s Slag Bath Circulation Pump (Model: SDZA200-315) for its centrifugal pump system (No. 02).

2024-05-11

Project Overview: Talcher Coal Gasification Project, India

Location: Angul District, Odisha, India
Project Scale:

  • 730,000 tons/year synthetic ammonia

  • 1.27 million tons/year urea
    Project Type: Full-scope EPC turnkey project, covering patent licensing, design, procurement, construction, and commissioning.

Key Highlights

  1. Largest Single-Train Coal-to-Fertilizer Complex Globally

    • India’s first modern, large-scale coal-to-fertilizer plant, addressing the nation’s reliance on imported oil/gas by leveraging its abundant coal reserves.

  2. EPC Scope by China National Chemical Engineering (CNCEC)

    • Covers entire process units: coal preparation, air separation, coal gasification, purification, ammonia/urea synthesis, plus utilities (circulating water, power distribution).

    • Total construction period: 46 months.

  3. Socioeconomic Impact

    • 4,000+ jobs during construction; 1,000+ long-term operational roles, boosting local employment and skills development.

    • Pioneering India’s coal-chemical industry, setting a benchmark for sustainable coal resource utilization.

Technological Significance

  • Centrifugal Pump Application: Our SDZA200-315 Slag Bath Circulation Pump ensures reliable high-temperature slag handling in the gasification process.

  • EPC Excellence: Integrates Chinese technology, equipment, and standards, demonstrating turnkey project capabilities under the Belt and Road Initiative.

Strategic Value

  • Reduces India’s fertilizer import dependency, enhancing energy security.

  • Promotes circular economy by converting coal into high-value agrochemicals.

F2FACF53D96EE90314F187A096AE.jpg